The Brief
From blank floor to brand command center in 72 hours.
Delta Electronics needed more than a booth at NVIDIA GTC 2025. They needed a stage for a product line that competes at the highest level of compute infrastructure. AMG designed and built a 30x30 island at the San Jose Convention Center that turned 900 square feet of convention floor into a fully immersive technology environment, built and installed in under three days. Attendees walked in and stayed.
The Design
Built to Perform on the Show Floor
- Concept design + 3D engineering
- Custom fabrication
- Large-format graphic production
- Freight + advance warehouse
- Move-in, install, and teardown
- On-site show management
The Result
Delivered. On Time. On Brand.
Full-service delivery across a 3-week production window. On-site build completed in under 72 hours at San Jose Convention Center. Zero outsourcing — concept through teardown handled entirely by AMG.